Loading verified project information…
Loading verified project information…
Developer identity currently being verified by Urbyn
Municipal planning records identify a proposal for 79 homes in a building up to 8 storeys. The application includes Rezoning, Development permit. Current municipal status: Conditional Approval.
Rezoning from from Comprehensive Development Zone (CD) to Low-Rise (5-8 Storey) with Commercial Zone (MR7-C); Development Variance Permit in Section F Yards and Setbacks of Part 24B Low-Rise (5-8 Storey) Apartment with Commercial Zone (MR7-C), reduce the minimum front (north) yard setback from 4.5 metres to 4.0 metres; b) in Section F Yards and Setbacks of Part 24B Low-Rise (5-8 Storey) Apartment with Commercial Zone (MR7-C), reduce the minimum side (east) yard setback from 7.5 metres to 4.0 metres; and c) in Section A.3(d) General Requirements of Part 5 Off-Street Parking and Loading / Unloading, reduce the minimum setback for a parking facility to a front lot line or lot line along a flanking street from 2.0 metres to 0.5 metres; Development Permit of a six-storey mixed-use apartment building with 79 residential units and ground floor commercial space.
Urbyn extracted the municipal planning facts from official municipal planning records.
Current recorded municipal status: Conditional Approval. This is context, not a verified stage history; projects may follow different approval paths.
These guides are city-wide context; this project has not been assigned to one of these neighbourhoods.
— proposed homes
— proposed homes
0 projects 20+ storeys
Straight-line distances from stored coordinates; nearest results may be beyond 1 km. Totals include known values only. Projects without coordinates are excluded.
Recorded municipal information, with changes observed by Urbyn. An application is not a sales launch or a promise of construction.
View this development on the map → · More in Surrey
This is the discovery date in Urbyn, not the municipal filing or approval date.
No subsequent verified change is recorded. Routine checks and technical updates are not timeline events.